Kitchen Renovation · Australia

Plan your kitchen renovation with a verified professional, and know what a quote should cover.

Tell us what you want to change and roughly what you have in mind. A verified kitchen professional who covers your postcode will get in touch to talk through the scope, the timing and what to compare, before you commit to a project this size.

  • Scope and options talked through before you commit
  • Matched to a firm that covers your postcode
  • No obligation to hire
Free · No obligation

Tell us what you need

A verified professional will get in touch.

01What do you need?
Service
Help us match you with the right kitchen renovator
02About you
03Where and how to reach you

We respect your privacy. Your information will be sent securely and handled with care.

How big is the project

Six levels of kitchen project, from light to major

Knowing which level you are at helps a firm tell you what is realistic.

01

A cosmetic refresh

New doors, handles, paint, lighting or a new splashback, with the layout unchanged.

02

New cabinets and benchtops

Replacing the cabinets and benchtops, often the biggest cost and the biggest visual change.

03

New appliances and lighting

New oven, cooktop, rangehood and lighting, which can need electrical or gas work.

04

Flooring and walls

New flooring, tiling and wall repairs around the new kitchen.

05

A full renovation

Everything replaced, usually with several trades such as plumbing and electrical.

06

Changing the layout

Moving walls, plumbing or gas. This is the most involved work and often needs approval.

What a quote should include

Six things to look for in a kitchen quote

01

Cabinets, benchtops and appliances

The make, range and finish of each, so you can compare like with like.

02

Installation and labour

Who installs what, and who is responsible for any fault.

03

Electrical, gas and plumbing

Who does them, whether they are licensed, and what is included.

04

Removal and disposal

Taking out the old kitchen and taking it away.

05

Making good

Wall repairs, painting and flooring after the installation.

06

Approvals and changes

Who arranges any permit or certificate, and how extra work is priced.

Before you sign

Six things to ask any kitchen firm before signing

01

Are you licensed and insured?

Ask for the licence number and proof of insurance, and check them yourself.

02

What is in the written contract?

The scope, the price, the schedule and the products, in writing.

03

How is my deposit protected?

And how payments are staged.

04

Who orders the cabinets, and what are the lead times?

Cabinets and appliances can take weeks, which sets the timeline.

05

How do you handle changes?

Ask how extra work is priced and approved, before it is done.

06

What is guaranteed, and how do you clean up?

Ask what is covered, for how long, and how the site is protected and left.

Why Namoye

Built around trust, not pressure.

We connect you with one verified provider who understands what you need. No hard sell, and no obligation.

  • Free to use
  • Verified providers
  • One real call
  1. 01

    Start with what you want to change

    Replacing doors and benchtops and rebuilding the whole room are very different projects. You talk through the scope before anyone prices it.

  2. 02

    Know what a quote should include

    You hear what to expect in a proper quote, so you can compare firms fairly.

  3. 03

    No pressure to sign

    You can ask questions and compare, and nobody pushes you to decide on the spot.

Good to Know

Questions about Namoye

How much does a kitchen renovation cost?

It varies widely with the size of the room, how much you change, the cabinets, benchtops and appliances you choose, and where you live. Namoye doesn't set prices. Ask for a written, itemised quote that shows what is included.

What is the difference between supply only and supply and install?

Supply only means you buy the cabinets and arrange installation yourself. Supply and install means one firm does both. Ask who is responsible if something doesn't fit or arrives damaged.

How long does it take?

It depends on the scope and on how long cabinets and appliances take to arrive, which can be weeks. Ask for a written schedule and what could change it.

Who should do the electrical, gas and plumbing work?

Electrical, gas and plumbing work must be done by tradespeople with the right licence in your state or territory, and the work is often certified when it's finished. Ask who does each part and for their licence number, and check it with your state or territory licensing body.

Do I need a permit?

Some work, such as moving walls, plumbing or gas, or altering the structure, can need council or private certifier approval. Ask the firm what applies and who arranges it. Don't let anyone remove a wall without checking.

Is a licensed builder required?

For larger jobs, state and territory rules generally require a licensed builder or contractor and a written contract, and the thresholds differ by state. Ask the firm for the licence and check it yourself.

How should I pay, and is my deposit safe?

Ask how much is due and when, and agree payments tied to progress rather than a large amount upfront. State rules limit the deposit on larger domestic building contracts, and the limits differ. Ask how your deposit is protected if the firm goes out of business.

What is home warranty insurance?

In most states, builders doing larger residential jobs must take out insurance that protects you if they die, disappear or become insolvent. The job-value threshold differs by state. Ask the firm whether it applies and for the certificate.

What if problems turn up behind the walls?

Older homes can hide surprises, such as outdated wiring, damp or asbestos, which was used in homes built before the 1990s. Ask how extra work is priced and approved, and agree any change in writing before it happens.

Can I stay in the house during the work?

Usually, but you may have no kitchen for a while. Ask how the firm will manage dust, water and power shut-offs, and what you should arrange in the meantime.

What should I have ready?

What you want to change, a rough budget and timeline, photos or measurements of the room, and your postcode. If you don't have everything, send the request anyway.

Is Namoye a kitchen company?

No. Namoye is a free matching service. It doesn't do the work, price it or guarantee it. The firm that contacts you is responsible for the job and the quote.

Will several firms call me, and does it cost anything?

No to both. A verified professional contacts you, and Namoye is free for you.

More in home services

All AU home services  ·  Bathroom Remodeling  ·  Plumbing

Namoye is a free matching service. It is not a kitchen company, builder or contractor and doesn't do, price or guarantee the work. Any quote comes from the firm that contacts you. Check their licence, insurance and references, and what protects your deposit, before you pay.

No Obligation. No Charges.

Tell us about your kitchen, and we'll find someone to talk to.

Send your details and a verified kitchen professional will get in touch. Free, with no obligation.

Talk to a kitchen professional